Helen Brown,
Miami-Dade County Planning and Zoning Department and Gary Greenan
provided the subcommittee with copies of the draft Marine Industrial
Zoning Overlay Ordinance, which is an “implementation step” of the
Miami River Corridor Urban Infill Plan.
The UIWG agreed that the secondary uses require limitations, and
the draft ordinance should be placed on the October UIWG agenda.
I)
Review of Major Use Special Permit Application for “
River Place
”,
615 SW 2nd Ave
– Mr. Bernardo Fort-Brescia,
Arquitectonica, presented the plans for “
River Place
”.
The Major Use Special Permit Application consists of a 42
story, 455 residential unit building facing the river with a restaurant
on the first floor connecting to a 20-foot wide publicly accessible
riverwalk, a office building fronting SW 7 ST with retail on the first
floor, and the historic art deco building currently on the site will be
moved to the corner of SW 2nd Ave and SW 7 ST with retail
uses. The Phase I
residential building is slightly setback above the parking garage, which
is facaded facing the River with townhomes.
The residential building maintains the required 50-foot setback
from the river, except for the eastern connection with a partially
filled water slip and the riverwalk section planned in the approved
“NEO Vertika” Major Use Special Permit.
The slip was presented as a potential water taxi stop.
Dr. Fran Bohnsack, Miami River Marine Group, suggested a
historical marker on the riverwalk adjacent to the slip to note WWII PT
boats were built at the site, and the potential developer agreed with
the concept. The Riverwalk
beneath the new
SW 2nd Ave
Bridge stops at the submerged land on the site’s western boundary, and
the potential developer stated willingness to fill the small corner to
connect the riverwalk sections. The
residential building maintains a three-story view corridor and public
promenade through the center of the site connecting an on-road Greenway
along SW 7 ST with the riverwalk. Dr.
Martin recommended design compatibility between the connecting
planned riverwalk sections at “
River Place
” and “Neo Vertika”, immediately east of the site.
Dr. Martin expressed support of the view corridor, public plaza,
and riverwalk treatments and the Greenways subcommittee found the
project to be consistent with the adopted Miami
River Greenway Action Plan. The
Phase II, 22-story office building has retail space facing SW 7 ST and
the lobby faces the interior pedestrian promenade.
The office buildings parking lots are fully facaded.
Kevin Reilly stated if the MUSP is approved, they might construct
the two phases simultaneously.
Brett Bibeau
, MRC, noted the Miami River Corridor Urban Infill Plan had recommended
a zoning change for this “lower river” downtown site, located east
of I-95, to be rezoned from marine industrial (SD-4), to SD-7 to allow
for a residential/mixed use development.
The City Commission approved the zoning and land use amendments
on
March 27, 2003
.
Murley
recommended the MRC assist in working with Florida Power and Light (FPL)
to develop an aesthetic treatment of the large substation and landscape
the parking lot directly across the River from the planned “
River Place
” and “Neo Vertika” sites, and immediately west of the “
River
Village
” pending MUSP application. Miller
stated perhaps a portion of the FPL parking lot should be considered for
a public use, such as an amphitheater.
The developer stated they were creating a rendering for the
planned improvements. Gilbert
Pastoriza recommended the MRC contact
Eloy Biasos
,
Florida
Power and Light and Dana Nottingham, Downtown Development Authority,
regarding aesthetic improvements to the substation.
Murley and the UIWG found the proposed “
River Place
” MUSP to be consistent with the Miami
River Corridor Urban Infill Plan, and offered assistance and support
in addressing the issues of providing aesthetic improvements to the FPL
substation and connecting the proposed riverwalk to the existing
riverwalk beneath the
2nd Ave
bridge. The “River Place
Development Technical Review Form” is attached.
II)
Review of Urban Infill Plan’s Revised Draft “Annual
Report” and “Integrated
Five-Year Financial Plan”
–
Bibeau
provided the UIWG with copies of revised draft “Annual Report” and
“5-Year Integrated Budget”. The
UIWG agreed to provide the drafts to the MRC on
October 6, 2003
, and bring them to the public
in October via hosting workshops in the “lower”, “middle” and
“upper” river sections, then return to the MRC in November for final
consideration and adoption. The
UIWG noted the need to itemize allocated funding for river port security
funding, Florida Department of Environmental Protection and additional
Miami-Dade
County
allocated funding within the
Miami River
corridor.
III)
Discussion of
N. & S. River Drive
Re-Routing Study – The UIWG identified the need to find
a Metropolitan Planning Organization member, which will champion this
MRC recommended North and
South River Drive
study to include the following considerations:
1)
Impact of developments on North and South River Drives
2)
Impact of on-road Greenway along North and South River
Drives
3)
Miami River Corridor Urban Infill Plan River Drive
recommendations
4)
Continued need to access marine industrial sites
5)
Examination of North and
South River Drive
as a route for a dedicated transit loop
6)
Good signage directing people to the River
7)
Noise barriers / buffers
8)
Consider all other plans and projects for river
transportation that impact North and South River Drives
The
UIWG estimated the study might cost between $300,000-400,000.
|